World Cup Stadium Green Point in Cape Town |
|
Project details: Due to the special requirements regarding transmission, reflection and absorption the colour used in this project was jointly developed by Ceramic Colors Wolbring and Wolfgang Imminger Consulting.
Glass producer: Thiele Glas, Schrotzberg. Load carrying system: self-supporting glass roof with approx. 37,500 m². Decoration: approx. 30,000 m² with the ceramic colour "TG Stadium White", decorated with roller application Project size: 8500 individual panes in 72 segments. Glass structure: 2 x 8 mm laminated heat-strengthened glass with particularly high static properties Total glass weight: approx. 1600 tons with approx. two tons of ceramic colour Production period: nine months.
|